Wastewater Feasibility Study

The Wastewater Feasibility Study is at 90% completion, and may be reviewed in its entirety here. To download the Wastewater Feasibility Study Power Point presentation by John Kenney of Dubois & King, please click here.

This study has been prepared by Dubois & King, Inc. for the purpose of evaluating the feasibility of expanding the existing wastewater collection system in West Windsor to potentially include the areas of Seems Road, Skyhawk Lane, and Village Lane.

Feedback or questions on the study options or the study itself may be directed to the Town Administrator at townadmin@westwindsorvt.org.